Translate

Thursday, January 31, 2008

Please Hold…

It’s been awhile since we have made a post and to be honest the main reason is not much is happening, or should I say not much interesting is happening. We are waiting for the final floor plans and to hear back from the City of Austin about the permit to beginning building. We are hoping to have the final plans and elevation soon. As soon as we get it or any other info we will be sure to post! In the mean time enjoy our favorite sweetener.

Wednesday, January 2, 2008

The United Colors of Agave

Well today we met with Julie the design consultant at Agave and we finished selecting the final touches on the arcology. The main color of the house will be the Hansel and Gretel inspired Gingerbread Man:
The highlight color will be Cedar "Fever" Lake:

The soffit (which is the name for what the part of the roof you see from the bottom looking up) color will be:

The cabinets will be this color and design (the hardware/handles will be different then what is here):


On top of the cabinets we are getting a Silestone counter top that is know as Capri Limestone:


The bathrooms will have Travertine Tile on the walls by the bath and walk-in shower: